Are you planning to build your home? Your dream home? Here are few essential things you must know about.
Accumulating the required budget and then to possess your own home is a desire, which everyone has in his/her life. An efficient planning is of vital importance to build better and manage cash-flow in a right fashion, so we thought it would be a nice idea to provide you with few elementary guidelines about House Construction Planning.
Given below are six imperative points that will aid you through the journey of building your home
It is the ratio of total Built-up-Area ( B.U.A ) to the Plot (Land) area. Colloquially it means, a FAR of 1.35 being proposed by a development authority allows one to build 1350 square feet of BUA over a plot-area of 1000 square feet.
Principal requirement before you start building home is to get concerned approvals which encompass overheads such as Plan Approval, Damp proof course (DPC), Occupation Certificate and few other secondary overheads.
Cost of building of your house primarily comprises of Design, Labor, and Material cost which typically are in proportion of 10%, 30%, and 60% respectively.
In a nutshell, more than half of total cost, i.e. material cost constitutes of
RCC* -Masonry(35%) and Finishing cost(65%), where Finishing includes Flooring, Painting, Plumbing, Electrical, and External development( Balcony & open area ).
It’s not the beauty of a house you should look at; it’s the construction of foundation that will stand the test of time. Therefore, to build better, it is important to know benefits of few materials. For e.g. AAC block, which is fire resistant and maintains air quality inside, can be used as a substitute to conventional clay bricks.(PRITHU practises methods that sustain your dream house for future generations using these acc blocks) The selection of correct steel bar is also vital in terms of durability. For e.g. TMT bar is more corrosion resistant, ductile, and has more weld-ability in comparison to conventional mild steel bars.
It can be done efficiently if you know the schedule of your house construction. A typical floor starts from basic structural work which includes RCC* work, brickwork and plaster-work. This generally takes 30 days to conclude. After that finishing work begins which includes painting, flooring, bathroom, kitchen, electrical works and external development, taking approximately another 25-30 days to conclude.
Building a new home is a journey full of both hard work and exciting times. It is always good to keep a little guideline about home building handy. There is a lot more to know. Instead make it hassle free with Prithu Homes, as your home building partner to get more out of your house.